Power Maintenance Scheduled Saturday (8/Feb) 6PM to Sunday 6AM.

Works on our power systems will commence at 6PM and is expected to finish no later than 6AM the following morning.The power works include the following: All racks to be supplied with an STS to allow for multiple power supplies to the rack. Secondary power source will be supplied to each rack and utilizied by the STS. Upgrade power ... إقرأ المزيد »

7th Feb 2014